The influence of the large diameter bored cast-in-place piles on foundation of old building

Identifieur interne : 000B72 ( PascalFrancis/Curation ); précédent : 000B71; suivant : 000B73

The influence of the large diameter bored cast-in-place piles on foundation of old building

Auteurs : V. Celmins [Lettonie]

Source :

RBID : Pascal:96-0444089

Descripteurs français

English descriptors

Abstract

Large diameter bored and cast in place piles were used in renovation design of Latvia Nationaal Opera house. The piles diameter was 1,50 m, length - 17 m. Distance to the nearest foundations of existing building of old Opera house - 3,50 m. The installation was done with equipment "KATO", produced in Japan. The borehole steel casing the first eleven meters go through medium, water-saturated sand, the next two meters - through clay soils, the last four meters - through marl with gypsum. After installation one corner of the existing building of old Opera house had a large settlement of 40 mm per four years. The checking of installation work records revealed serious mistakes in installation process
pA  
A08 01  1  ENG  @1 The influence of the large diameter bored cast-in-place piles on foundation of old building
A11 01  1    @1 CELMINS (V.)
A14 01      @1 Celminia Buvkonctrukciju projektesanas birojs @2 Riga @3 LVA
A20       @1 103-107
A21       @1 1995
A23 01      @0 ENG
A25 01      @1 A.A. Balkema @2 Rotterdam
A30 01  1  ENG  @1 Baltic Geotechnics'95. Baltic Geotechnical Conference @2 8 @3 Vilnius, Lithuania @4 1995-10-02
A43 01      @1 BRGM @2 L/14215
A44       @0 0209
A47 01  1    @0 96-0444089
A60       @1 C
A61       @0 A
A66 01      @0 NLD
C01 01    FRE  @0 Large diameter bored and cast in place piles were used in renovation design of Latvia Nationaal Opera house. The piles diameter was 1,50 m, length - 17 m. Distance to the nearest foundations of existing building of old Opera house - 3,50 m. The installation was done with equipment "KATO", produced in Japan. The borehole steel casing the first eleven meters go through medium, water-saturated sand, the next two meters - through clay soils, the last four meters - through marl with gypsum. After installation one corner of the existing building of old Opera house had a large settlement of 40 mm per four years. The checking of installation work records revealed serious mistakes in installation process
C02 01  2    @0 226B01
C02 02  X    @0 001E01O01
C03 01  2  FRE  @0 Pieu
C03 01  2  ENG  @0 piles
C03 01  2  SPA  @0 Estaca
C03 02  2  FRE  @0 Bâtiment
C03 02  2  ENG  @0 buildings
C03 02  2  SPA  @0 Edificio
C03 03  2  FRE  @0 Fondation
C03 03  2  ENG  @0 foundations
C03 03  2  SPA  @0 Cimentación
C03 04  2  FRE  @0 Mécanique sol
C03 04  2  ENG  @0 soil mechanics
C03 04  2  SPA  @0 Mecánica suelo
C03 05  2  FRE  @0 Lettonie @2 NG
C03 05  2  ENG  @0 Latvia @2 NG
C03 05  2  SPA  @0 Letonia @2 NG
C06       @0 ILS
C07 01  2  FRE  @0 Europe Est @2 NG
C07 01  2  ENG  @0 Eastern Europe @2 NG
C07 01  2  SPA  @0 Europa del Este @2 NG
C07 02  2  FRE  @0 Europe @2 NG
C07 02  2  ENG  @0 Europe @2 NG
C07 02  2  SPA  @0 Europa @2 NG
N21       @1 303

Links toward previous steps (curation, corpus...)


Links to Exploration step

Pascal:96-0444089

Le document en format XML

<record>
<TEI>
<teiHeader>
<fileDesc>
<titleStmt>
<title xml:lang="en" level="a">The influence of the large diameter bored cast-in-place piles on foundation of old building</title>
<author>
<name sortKey="Celmins, V" sort="Celmins, V" uniqKey="Celmins V" first="V." last="Celmins">V. Celmins</name>
<affiliation wicri:level="1">
<inist:fA14 i1="01">
<s1>Celminia Buvkonctrukciju projektesanas birojs</s1>
<s2>Riga</s2>
<s3>LVA</s3>
</inist:fA14>
<country>Lettonie</country>
</affiliation>
</author>
</titleStmt>
<publicationStmt>
<idno type="wicri:source">INIST</idno>
<idno type="inist">96-0444089</idno>
<date when="1995">1995</date>
<idno type="stanalyst">PASCAL 96-0444089 BRGM</idno>
<idno type="RBID">Pascal:96-0444089</idno>
<idno type="wicri:Area/PascalFrancis/Corpus">000957</idno>
<idno type="wicri:Area/PascalFrancis/Curation">000B72</idno>
</publicationStmt>
<sourceDesc>
<biblStruct>
<analytic>
<title xml:lang="en" level="a">The influence of the large diameter bored cast-in-place piles on foundation of old building</title>
<author>
<name sortKey="Celmins, V" sort="Celmins, V" uniqKey="Celmins V" first="V." last="Celmins">V. Celmins</name>
<affiliation wicri:level="1">
<inist:fA14 i1="01">
<s1>Celminia Buvkonctrukciju projektesanas birojs</s1>
<s2>Riga</s2>
<s3>LVA</s3>
</inist:fA14>
<country>Lettonie</country>
</affiliation>
</author>
</analytic>
</biblStruct>
</sourceDesc>
</fileDesc>
<profileDesc>
<textClass>
<keywords scheme="KwdEn" xml:lang="en">
<term>Latvia</term>
<term>buildings</term>
<term>foundations</term>
<term>piles</term>
<term>soil mechanics</term>
</keywords>
<keywords scheme="Pascal" xml:lang="fr">
<term>Pieu</term>
<term>Bâtiment</term>
<term>Fondation</term>
<term>Mécanique sol</term>
<term>Lettonie</term>
</keywords>
<keywords scheme="Wicri" type="geographic" xml:lang="fr">
<term>Lettonie</term>
</keywords>
<keywords scheme="Wicri" type="topic" xml:lang="fr">
<term>Bâtiment</term>
<term>Fondation</term>
</keywords>
</textClass>
</profileDesc>
</teiHeader>
<front>
<div type="abstract" xml:lang="fr">Large diameter bored and cast in place piles were used in renovation design of Latvia Nationaal Opera house. The piles diameter was 1,50 m, length - 17 m. Distance to the nearest foundations of existing building of old Opera house - 3,50 m. The installation was done with equipment "KATO", produced in Japan. The borehole steel casing the first eleven meters go through medium, water-saturated sand, the next two meters - through clay soils, the last four meters - through marl with gypsum. After installation one corner of the existing building of old Opera house had a large settlement of 40 mm per four years. The checking of installation work records revealed serious mistakes in installation process</div>
</front>
</TEI>
<inist>
<standard h6="B">
<pA>
<fA08 i1="01" i2="1" l="ENG">
<s1>The influence of the large diameter bored cast-in-place piles on foundation of old building</s1>
</fA08>
<fA11 i1="01" i2="1">
<s1>CELMINS (V.)</s1>
</fA11>
<fA14 i1="01">
<s1>Celminia Buvkonctrukciju projektesanas birojs</s1>
<s2>Riga</s2>
<s3>LVA</s3>
</fA14>
<fA20>
<s1>103-107</s1>
</fA20>
<fA21>
<s1>1995</s1>
</fA21>
<fA23 i1="01">
<s0>ENG</s0>
</fA23>
<fA25 i1="01">
<s1>A.A. Balkema</s1>
<s2>Rotterdam</s2>
</fA25>
<fA30 i1="01" i2="1" l="ENG">
<s1>Baltic Geotechnics'95. Baltic Geotechnical Conference</s1>
<s2>8</s2>
<s3>Vilnius, Lithuania</s3>
<s4>1995-10-02</s4>
</fA30>
<fA43 i1="01">
<s1>BRGM</s1>
<s2>L/14215</s2>
</fA43>
<fA44>
<s0>0209</s0>
</fA44>
<fA47 i1="01" i2="1">
<s0>96-0444089</s0>
</fA47>
<fA60>
<s1>C</s1>
</fA60>
<fA61>
<s0>A</s0>
</fA61>
<fA66 i1="01">
<s0>NLD</s0>
</fA66>
<fC01 i1="01" l="FRE">
<s0>Large diameter bored and cast in place piles were used in renovation design of Latvia Nationaal Opera house. The piles diameter was 1,50 m, length - 17 m. Distance to the nearest foundations of existing building of old Opera house - 3,50 m. The installation was done with equipment "KATO", produced in Japan. The borehole steel casing the first eleven meters go through medium, water-saturated sand, the next two meters - through clay soils, the last four meters - through marl with gypsum. After installation one corner of the existing building of old Opera house had a large settlement of 40 mm per four years. The checking of installation work records revealed serious mistakes in installation process</s0>
</fC01>
<fC02 i1="01" i2="2">
<s0>226B01</s0>
</fC02>
<fC02 i1="02" i2="X">
<s0>001E01O01</s0>
</fC02>
<fC03 i1="01" i2="2" l="FRE">
<s0>Pieu</s0>
</fC03>
<fC03 i1="01" i2="2" l="ENG">
<s0>piles</s0>
</fC03>
<fC03 i1="01" i2="2" l="SPA">
<s0>Estaca</s0>
</fC03>
<fC03 i1="02" i2="2" l="FRE">
<s0>Bâtiment</s0>
</fC03>
<fC03 i1="02" i2="2" l="ENG">
<s0>buildings</s0>
</fC03>
<fC03 i1="02" i2="2" l="SPA">
<s0>Edificio</s0>
</fC03>
<fC03 i1="03" i2="2" l="FRE">
<s0>Fondation</s0>
</fC03>
<fC03 i1="03" i2="2" l="ENG">
<s0>foundations</s0>
</fC03>
<fC03 i1="03" i2="2" l="SPA">
<s0>Cimentación</s0>
</fC03>
<fC03 i1="04" i2="2" l="FRE">
<s0>Mécanique sol</s0>
</fC03>
<fC03 i1="04" i2="2" l="ENG">
<s0>soil mechanics</s0>
</fC03>
<fC03 i1="04" i2="2" l="SPA">
<s0>Mecánica suelo</s0>
</fC03>
<fC03 i1="05" i2="2" l="FRE">
<s0>Lettonie</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="05" i2="2" l="ENG">
<s0>Latvia</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="05" i2="2" l="SPA">
<s0>Letonia</s0>
<s2>NG</s2>
</fC03>
<fC06>
<s0>ILS</s0>
</fC06>
<fC07 i1="01" i2="2" l="FRE">
<s0>Europe Est</s0>
<s2>NG</s2>
</fC07>
<fC07 i1="01" i2="2" l="ENG">
<s0>Eastern Europe</s0>
<s2>NG</s2>
</fC07>
<fC07 i1="01" i2="2" l="SPA">
<s0>Europa del Este</s0>
<s2>NG</s2>
</fC07>
<fC07 i1="02" i2="2" l="FRE">
<s0>Europe</s0>
<s2>NG</s2>
</fC07>
<fC07 i1="02" i2="2" l="ENG">
<s0>Europe</s0>
<s2>NG</s2>
</fC07>
<fC07 i1="02" i2="2" l="SPA">
<s0>Europa</s0>
<s2>NG</s2>
</fC07>
<fN21>
<s1>303</s1>
</fN21>
</pA>
</standard>
</inist>
</record>

Pour manipuler ce document sous Unix (Dilib)

EXPLOR_STEP=$WICRI_ROOT/Wicri/Musique/explor/OperaV1/Data/PascalFrancis/Curation
HfdSelect -h $EXPLOR_STEP/biblio.hfd -nk 000B72 | SxmlIndent | more

Ou

HfdSelect -h $EXPLOR_AREA/Data/PascalFrancis/Curation/biblio.hfd -nk 000B72 | SxmlIndent | more

Pour mettre un lien sur cette page dans le réseau Wicri

{{Explor lien
   |wiki=    Wicri/Musique
   |area=    OperaV1
   |flux=    PascalFrancis
   |étape=   Curation
   |type=    RBID
   |clé=     Pascal:96-0444089
   |texte=   The influence of the large diameter bored cast-in-place piles on foundation of old building
}}

Wicri

This area was generated with Dilib version V0.6.21.
Data generation: Thu Apr 14 14:59:05 2016. Site generation: Thu Oct 8 06:48:41 2020